Operations & Performance
Cost, throughput, quality and service: the operation measured where the work actually happens, then redesigned with the people who do it, to a number agreed before we start.
£110–160k, fixed · quoted before we start
Four numbers before the argument.
The measure
−23%
unplanned turbine downtime, over a year
Duration
10 weeks
Embedded, on the floor, in the depot, in the queue
Fee
£110–160k
fixed, quoted before we start
Stage of the method
03
Delivery, 12 weeks of the 28
Four parts, and what each is for.
Process measurement
Time, touches, rework and waits, counted at the point of work, not estimated in a workshop.
Capacity & scheduling
Demand against capacity by hour, site and skill; the mismatch is usually the whole story.
Supply chain
Inventory, lead time and service level, and the trade-off between them made explicit.
Service operations
Queues, backlogs and handovers, redesigned so the worst-served customer is served first.
Eight steps, in this order, every time.
S.01
The measurement
six weeks on the floor, every step timed
6
S.02
The mismatch
demand against capacity by hour, site and skill
5
S.03
The redesign
written with the team leads, tested on one queue
4
S.04
The run-rate
tracked weekly, published to the board monthly
4
S.05
The waste ledger
every wait, rework and handover costed
3
S.06
The shift pattern
rosters rebuilt against the demand curve
3
S.07
The handover
the floor runs it without us for four weeks first
2
S.08
The twelve-month check
one visit, one number, published either way
1
Bars at true proportion; the counts are engagements in which the step was decisive.
What you are holding at the end.
You leave with /
The operation, measured: a baseline your own team can rerun
A redesign the team leads wrote with us
A run-rate improvement, tracked weekly for a year
−23% unplanned turbine downtime, over a year
Buy this when /
01Cost is rising faster than volume and every team has a reason why it is another team's fault.
02Service levels are missed in the same places every quarter.
03A previous efficiency programme delivered its slides and none of its savings.
If none of these is true yet, the audit is the cheaper place to start.
“The schedule is argued with now, rather than followed. That is the difference between a tool the floor trusts and one it works around.”



Where it has been bought, and what it came to.

Maintenance regime redesign at Halvard Energy
−23%
unplanned turbine downtime

Network redesign at Northline Logistics
+9.6pp
on-time delivery across the network
The full record /
64cases
Every engagement we are allowed to name, each with the figure agreed at the start.
All casesThe clients on the record.
The other 5 services, never a dead end.
Agree the number before the work starts.
The audit / four weeks
A.01One figure, agreed in writing before any work
A.02£45–65k, fixed, whatever the audit finds
A.03It prices the stage after it, so nothing is bought blind