Skip to content

Network redesign at Northline Logistics

Forty depots, two disagreeing forecasts, and a network resequenced around the hours the depots actually had.

Operations & Performance · Northline Logistics

Where it sat in the method: stage 03, 12 weeks of the 28.

01
02
03
04

Operations & Performance is stage 03 work. Every engagement opens with the audit whichever stage it lands in, and the roadmap from that audit is what priced this one.

01

The challenge

Two demand forecasts disagreed by enough to change hiring, and neither team could say which was right. Meanwhile the worst-served routes were the ones with the least capacity to report it.

02

The approach

One definition of a shipment, one owner per field, and six weeks measuring depot capacity by hour and skill. The network was then resequenced so the routes with the worst service got capacity first, and the two forecasts became one, because they finally counted the same thing.

03

The result

On-time delivery improved 9.6 percentage points across the network within two quarters, and the disagreement between the forecasts stopped being possible.

+9.6pp

on-time delivery across the network

How it was measured 

Measured as the share of consignments delivered inside the promised window, across all forty depots, over the two quarters after the resequencing against the two before. Stated this way because a figure without its method is a claim. Ask us for the workings: we will send them.

01Flows

02Network

03Cutover

04Run

01

4 wks

The flows

Every lane, every depot and every empty leg, mapped from twelve months of manifests.

Closes on the true cost per pallet-mile

02

8 wks

The network

Depots consolidated from nine to six, routes rebuilt against the demand map, tested on one region first.

Closes on a signed network and a cutover plan

The engagement, on paper.

The record

ClientNorthline Logistics

SectorLogistics & transport

ServiceOperations & Performance

Year2024

Duration10 weeks

Fee£110–160k, fixed

You leave with 10 weeks

The operation, measured: a baseline your own team can rerun

A redesign the team leads wrote with us

A run-rate improvement, tracked weekly for a year

What Operations & Performance hands over, whichever client bought it. This one is the version Northline Logistics runs now.

notebook 3
On the engagement
“The roadmap came with prices, owners and a first business case our board approved in one sitting.”
Chief Operating Officer, Northline Logistics2024 · outcome +9.6pp

Three more, the same sector first.

team 1
Energy & utilities 2024

Maintenance regime redesign at Halvard Energy

−23%
unplanned turbine downtime

Read the case
work 1
Insurance 2025

Claims triage copilot at Meridian Mutual

−41%
claims-processing time

Read the case
board 2
Financial services 2025

Model-risk framework for Cobalt Bank

14 days
to audit-ready, from ninety

Read the case

The service behind itP.02

Operations & Performance

Cost, throughput, quality and service: the operation measured where the work actually happens, then redesigned with the people who do it, to a number agreed before we start.

10 weeks · £110–160k, fixed

Next in the register4 of 12

Range and pricing strategy at Ostro Retail Group

+3.4pp

gross margin, twelve months after repricing

Retail & consumer

Agree the number before the work starts.

The audit / four weeks

A.01One figure, agreed in writing before any work

A.02£45–65k, fixed, whatever the audit finds

A.03It prices the stage after it, so nothing is bought blind